1. Job Responsibilities
1.1. Design circuit for test IC, Wafer and module follow existing Microchip Tester standard.
1.2. Manage project resource (CAD, Mechanical Eng. and Assembly Lab) to complete the assigned project within time line.
1.3. Communicate with internal customer to update project progress/status, possible problem and confirm the output of each project phase.
1.4. Identify if assigned project need collaborate project, co-ordinate with other project member to make sure project time line is synchronized.
1.5. Communicate with supplier for the project that need to build by outsource supplier (such as probe card for wafer test).
1.6. Design customized electronics tooling to use in production.
1.7. Publish/ensure project’s document is submitted to document control center.
1.8. Supervise design team on efficient/best practice design for each product family.
1.9. Leading pioneer project for new tester platform to develop standard set for the platform. Deliver golden sample project to use as the reference project for the rest of team.
1.10. Propose/publish technical knowledge to improve/extend test system group knowledge base.
1.11. Provide design training for new team member and for engineer in other group to standardize design flow.
1.12. Propose/revise working procedure in each design phase to improve design cycle time/robustness and reduce non-value added process.
1.13. Analyze the project input/specification; call for meeting with project requestor to make sure all of project aspect is clear.
1.14. Verify the assigned project readiness, identify the necessary resource to complete project. Make a request for the needed tool/component/resource.
1.15. Create schematic using Microchip provided software tool, transfer project to CAD team once schematic is done and approve by project requestor.
1.16. Call for meeting with requestor and related design team when each phase of project is done for approval and move project to next phase.
1.17. Collect and update document in each design phase, submit all the related document to document control center once project is done
1.18. Ensure all the design related file/document is available for other people to use later.
1.19. Collecting design problem, design tip that happen in each project and publish to test system group.
1.20. Draft course outline and conduct the training as requested
1.21. Coaching team member to improve overall team performance